Timber on Top

The project’s logic includes save what works, demolish what is necessary and add what is needed. Inventories has been made to see what can be saved and reused within the framework of the project. This led to a timber-structure being placed on top of the existing steel columns creating a second floor. The daylit double height entrance hall will welcome 750 students in 2024.